Cargando…
Run 674, 8th December 1975, Rings 1 and 2 - 26 GeV/c - low-B, high luminosity with low-B
Autores principales: | Brand, K, Koutchouk, Jean-Pierre |
---|---|
Lenguaje: | eng |
Publicado: |
1975
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131086 |
Ejemplares similares
-
Run 662 - 18 November 1975, Ring 1 - 26 GeV/c - low-B, Measurement of B
por: Brand, K, et al.
Publicado: (1975) -
Run 683 - 19th December 1975, 10 x The ISR Design Luminosity using the low-B Section
por: Brand, K, et al.
Publicado: (1976) -
Run 580 -26 GeV/c - 18.3.1975, Run 586 - 26 GeV/c - 26.3.1975, Run 590 - 26 GeV/c - 8.4.1975: Tests with the low-B insertion in 17
por: Autin, B, et al.
Publicado: (1975) -
Run 651 - 4 November 1975, Rings 1 and 2 - 26 GeV/c - with SFM and low-B, Low-B check
por: Vos, L, et al.
Publicado: (1975) -
Run 625 - 22 July 1975, Ring 1 - 26 GeV/c - Low-B, Measurement of B's at pick-ups
por: Brand, K
Publicado: (1975)