Cargando…
Run 662 - 18 November 1975, Ring 1 - 26 GeV/c - low-B, Measurement of B
Autores principales: | Brand, K, Gourber, J P |
---|---|
Lenguaje: | eng |
Publicado: |
1975
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131097 |
Ejemplares similares
-
Run 662 - 19 November 1975, Rings 1 and 2 - 26.5 GeV/c, Low-B and phase displacement
por: Wyss, C
Publicado: (1975) -
Run 580 -26 GeV/c - 18.3.1975, Run 586 - 26 GeV/c - 26.3.1975, Run 590 - 26 GeV/c - 8.4.1975: Tests with the low-B insertion in 17
por: Autin, B, et al.
Publicado: (1975) -
Run 612 - 30 June 1975, Ring 1 - 26 GeV/c - Low-B- SFM, Orbit Measurements
por: Brand, K, et al.
Publicado: (1975) -
Run 600 - 19 May 1975 - 26 GeV/c, Run 603P - 24 May 1975 - 26 GeV/c
por: Brand, K, et al.
Publicado: (1975) -
Run 651 - 4 November 1975, Rings 1 and 2 - 26 GeV/c - with SFM and low-B, Low-B check
por: Vos, L, et al.
Publicado: (1975)