Cargando…
Run 651 - 3 November 1975, Ring 1 - 26 GeV/c, Check of QCOM with Terwilliger scheme
Autor principal: | Guignard, G |
---|---|
Lenguaje: | eng |
Publicado: |
1975
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131106 |
Ejemplares similares
-
Run 651 - 4 November 1975, Rings 1 and 2 - 26 GeV/c - with SFM and low-B, Low-B check
por: Vos, L, et al.
Publicado: (1975) -
Run 639 - 10th October 1975 - 26 GeV/c - Ring 1, Terwilliger Scheme Improvement
por: Bryant, P J, et al.
Publicado: (1975) -
Runs 651 and 656 - 2 and 10 November 1975, Ring 2 - 26 GeV/c, Data base for the Q-shift programs in the FP/8C region
por: Guignard, G
Publicado: (1975) -
Run 382 - 9 November 1973, Ring 1 - 26 GeV/c: Optimization of Terwilliger Diamond
por: Wyss, C
Publicado: (1974) -
Run 250 - 1 November 1972, Rings 1 and 2 - 26 GeV/c - 20 bunches, Higher intensities with the Terwilliger scheme
por: Bryant, P J
Publicado: (1972)