Cargando…
Runs 651 and 656 - 2 and 10 November 1975, Ring 2 - 26 GeV/c, Data base for the Q-shift programs in the FP/8C region
Autor principal: | Guignard, G |
---|---|
Lenguaje: | eng |
Publicado: |
1975
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131108 |
Ejemplares similares
-
Run 651 - 3 November 1975, Ring 1 - 26 GeV/c, Check of QCOM with Terwilliger scheme
por: Guignard, G
Publicado: (1975) -
Run 651 - 4 November 1975, Rings 1 and 2 - 26 GeV/c - with SFM and low-B, Low-B check
por: Vos, L, et al.
Publicado: (1975) -
Run 575 - 26 GeV/c - 10.3.1975, Run 580 - 26 GeV/c - 17.3.1975, Run 587 - 15 GeV/c - 3.4.1975: Various coupling measurements in the ISR
por: Bryant, P J, et al.
Publicado: (1975) -
Runs 639, 651 and 656, Tests of the Poleface Windings power supplies
por: Fischer, E, et al.
Publicado: (1976) -
Runs 641, 651, 656 and 669, 13th October - 1st December 1975, Running-in of the Transfer Beam Position Monitoring System
por: Borer, J, et al.
Publicado: (1975)