Cargando…
Run 651, 75-11-03, 26 GeV, Clearing current measurement
Autores principales: | Gröbner, Oswald, Strubin, P |
---|---|
Lenguaje: | eng |
Publicado: |
1975
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131110 |
Ejemplares similares
-
Run 666 27-11-75, Ring 1, 26 GeV, Run 683 19-12-75, Ring 1, 26 GeV, What could be the cause for the excessive clearing currents?
por: Gröbner, Oswald, et al.
Publicado: (1976) -
Tun 580, 26 GeV, ELSA - working line, 75.03.17: Measurement of the self-clearing rate as a function of beam current
por: Gröbner, Oswald, et al.
Publicado: (1975) -
Run 641, 26 GeV, FP-line, 13.10.75, Run 656, 26 GeV, ELSA-line, 11.11.75, Run 669, 26 GeV, 8C-line, 02.12.75, RF-clearing experiments with the scanning cavity
por: Frischholz, Hans, et al.
Publicado: (1976) -
Run 605, 26/05/75, 26 GeV/c without SFM: Influence of the clearing electrodes on $h_{eff}$ during shaving
por: Gröbner, Oswald, et al.
Publicado: (1975) -
run 656, 75-11-10, Ring 1, 26 GeV, ELVA, Pressure bumps at B-max places
por: Gröbner, Oswald, et al.
Publicado: (1975)