Cargando…
Run 651 - 4 November 1975, Rings 1 and 2 - 26 GeV/c - with SFM and low-B, Low-B check
Autores principales: | Vos, L, Brand, K |
---|---|
Lenguaje: | eng |
Publicado: |
1975
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131112 |
Ejemplares similares
-
Run 651 - 3 November 1975, Ring 1 - 26 GeV/c, Check of QCOM with Terwilliger scheme
por: Guignard, G
Publicado: (1975) -
Run 612 - 30 June 1975, Ring 1 - 26 GeV/c - Low-B- SFM, Orbit Measurements
por: Brand, K, et al.
Publicado: (1975) -
Run 662 - 18 November 1975, Ring 1 - 26 GeV/c - low-B, Measurement of B
por: Brand, K, et al.
Publicado: (1975) -
Run 646 - 28 October 1975, Rings 1 and 2 - 11 GeV/c - with SFM and low-B, Low-B test at 11 GeV/c
por: Brand, K, et al.
Publicado: (1975) -
Run 625 - 22 July 1975, Ring 1 - 26 GeV/c - Low-B, Measurement of B's at pick-ups
por: Brand, K
Publicado: (1975)