Cargando…
Runs 641, 651, 656 and 669, 13th October - 1st December 1975, Running-in of the Transfer Beam Position Monitoring System
Autores principales: | Borer, J, Hémery, J Y, De Jonge, L |
---|---|
Lenguaje: | eng |
Publicado: |
1975
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131119 |
Ejemplares similares
-
Runs 639, 651 and 656, Tests of the Poleface Windings power supplies
por: Fischer, E, et al.
Publicado: (1976) -
Run 641, 26 GeV, FP-line, 13.10.75, Run 656, 26 GeV, ELSA-line, 11.11.75, Run 669, 26 GeV, 8C-line, 02.12.75, RF-clearing experiments with the scanning cavity
por: Frischholz, Hans, et al.
Publicado: (1976) -
Runs 651 and 656 - 2 and 10 November 1975, Ring 2 - 26 GeV/c, Data base for the Q-shift programs in the FP/8C region
por: Guignard, G
Publicado: (1975) -
Run 631 - 29th September 1975 - 15 GeV/c - R2, Run 641 - 13th October 1975 - 26 GeV/c - R2, Tests Performed on PFW13
por: CERN. Geneva. Intersecting Storage Ring Division
Publicado: (1975) -
Run 641, 13.10.1975, 26 GeV/c, Measurement of the B-functions in the ISR
por: Hofmann, A, et al.
Publicado: (1975)