Cargando…
Run 639 - 10th October 1975 - 26 GeV/c - Ring 1, Terwilliger Scheme Improvement
Autores principales: | Bryant, P J, Potter, K |
---|---|
Lenguaje: | eng |
Publicado: |
1975
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131126 |
Ejemplares similares
-
Run 651 - 3 November 1975, Ring 1 - 26 GeV/c, Check of QCOM with Terwilliger scheme
por: Guignard, G
Publicado: (1975) -
Run 376 - 29 October 1973, Rings 1 and 2 - 26 to 31 GeV/c - 20 bunches: 31 GeV/c operation with the SFM and the Terwilliger scheme
por: Bryant, P J
Publicado: (1973) -
"ISR Performance Report, Run 605 Ring 1 26 GeV/c TW, Precision of ""LUMS"" with Terwilliger scheme"
por: Potter, K
Publicado: (1975) -
Run 239 - 18 October 1972, Rings 1 and 2 - 22 GeV/c - 20 bunches: High intensity with the Terwilliger scheme
por: Bryant, P J
Publicado: (1972) -
Run 156 - 17th April 1972, Ring 1 - 22 GeV/c - 4 bunches: Terwilliger Scheme
por: Bryant, P J
Publicado: (1972)