Cargando…
Runs 694, 702 and 707 - 15 March, 1 and 7 April 1976, Ring 2 - 26 GeV/c, Status report on the data base for the Q-shift program
Autor principal: | Guignard, G |
---|---|
Lenguaje: | eng |
Publicado: |
1976
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131138 |
Ejemplares similares
-
Run 707 7.4.1976, Ring 1 26 GeV, 8 C working line + 50 MHz feedback
por: Fischer, E, et al.
Publicado: (1976) -
Run 707, 8.4.1976, 0 - 7 a.m, Ring 1 and 2, 26 and 11 GeV, Measurement of beam-beam limit
por: Hutton, A, et al.
Publicado: (1976) -
Run 776 - 18 November - 26 GeV/c - Rings 1 and 2, Run 791 - 13 December 1976 - 26 GeV/c - Physics set-up and run, Run 764 - 20 December 1976 - 26 GeV/c - Physics run and luminosity, First running-in tests of I1 superconducting solenoid
por: Bryant, P J, et al.
Publicado: (1977) -
Run 708 - 24 April 1976, Rings 1 and 2 - 26 GeV/c - low-B, Acceleration with low-B - Preliminary tests
por: Brand, K, et al.
Publicado: (1976) -
Run 1015, 22.3.79, 26 GeV/c, rings 1 and 2, Run 1017, 26.3.79, 26 GeV/c, rings 1 and 2, First running-in tests of the OAFM system
por: Guignard, G, et al.
Publicado: (1979)