Cargando…
Run 707 7.4.1976, Ring 1 26 GeV, 8 C working line + 50 MHz feedback
Autores principales: | Fischer, E, Gröbner, Oswald, Strubin, P, Laurent, J M |
---|---|
Lenguaje: | eng |
Publicado: |
1976
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131144 |
Ejemplares similares
-
Run 728, 31st May 1976, 26 GeV 8C working line with 50 MHz feedback, Run 731, 1-4th June 1976, Test of prototype system for measuring clearing currents
por: Gröbner, Oswald, et al.
Publicado: (1976) -
Run 741, 18th June 1976, 26 GeV, Test of prototype system for measuring clearing currents
por: Gröbner, Oswald, et al.
Publicado: (1976) -
Run 666 27-11-75, Ring 1, 26 GeV, Run 683 19-12-75, Ring 1, 26 GeV, What could be the cause for the excessive clearing currents?
por: Gröbner, Oswald, et al.
Publicado: (1976) -
Run 982, 26 GeV, Ring 2, 12.10.1978, Beam loss detection with clearing electrodes
por: Gröbner, Oswald, et al.
Publicado: (1978) -
Secondary ionisation measurements and pressure stability behaviour, Run 783, Ring 1, 26 GeV, 29.11.76
por: Gröbner, Oswald, et al.
Publicado: (1976)