Cargando…
Run 711 - 27 April 1976, Ring 1 - 11.776 GeV/c - 8C working line, Test of COCO program
Autor principal: | Autin, B |
---|---|
Lenguaje: | eng |
Publicado: |
1976
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131149 |
Ejemplares similares
-
Run 711, 27-28-4-1976, Both Rings, 11 GeV/c, Beam-Beam Q-Shift measurement with hihg-B insertion
por: Keil, Eberhard, et al.
Publicado: (1976) -
Run 772 - 8.11.1976, Run 776 - 19.11.1976, Run 779 - 22.11.1976, Rings 1 and 2 - 26 GeV/c, Tests of the low-B insertion in I1
por: Brand, K, et al.
Publicado: (1977) -
Run 776 - 18 November - 26 GeV/c - Rings 1 and 2, Run 791 - 13 December 1976 - 26 GeV/c - Physics set-up and run, Run 764 - 20 December 1976 - 26 GeV/c - Physics run and luminosity, First running-in tests of I1 superconducting solenoid
por: Bryant, P J, et al.
Publicado: (1977) -
Run 163 - 26 April 1972, Rings 1 and 2 - 22 GeV/c - 22 FP - 20 bunches
por: Autin, B
Publicado: (1972) -
Run 46 - 7 April 1971 - 21.00-24.00h, Both Rings, 22 GeV/c, 4 bunches
por: Autin, B, et al.
Publicado: (1971)