Cargando…
Run 728, 31st May 1976, 26 GeV 8C working line with 50 MHz feedback, Run 731, 1-4th June 1976, Test of prototype system for measuring clearing currents
Autores principales: | Gröbner, Oswald, Strubin, P |
---|---|
Lenguaje: | eng |
Publicado: |
1976
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131165 |
Ejemplares similares
-
Run 741, 18th June 1976, 26 GeV, Test of prototype system for measuring clearing currents
por: Gröbner, Oswald, et al.
Publicado: (1976) -
Run 707 7.4.1976, Ring 1 26 GeV, 8 C working line + 50 MHz feedback
por: Fischer, E, et al.
Publicado: (1976) -
Run 728 (730), 31.5.1976, Ring 2, 26 GeV, Longitudinal dilution of bunches with the Landau cavity
por: Bramham, P, et al.
Publicado: (1977) -
Run 853, 27th June 1977, 26 GeV, Measurements with the clearing current monitor in octant 4
por: Gröbner, Oswald, et al.
Publicado: (1977) -
Run 651, 75-11-03, 26 GeV, Clearing current measurement
por: Gröbner, Oswald, et al.
Publicado: (1975)