Cargando…
"ISR Performance Report, Run 742, 24.6.1976, Ring 1, 26 GeV/c: Ring 2, 11 GeV/c, Beam-beam limit with high beta insertion"
Autores principales: | Keil, Eberhard, Lewis, D, Vos, L, Zotter, B |
---|---|
Lenguaje: | eng |
Publicado: |
1976
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131173 |
Ejemplares similares
-
Run 724, 24.5.1976, Both rings, 26/11 GeV/c, Beam-beam limit with high-B insertion
por: Keil, Eberhard, et al.
Publicado: (1976) -
Run 711, 27-28-4-1976, Both Rings, 11 GeV/c, Beam-Beam Q-Shift measurement with hihg-B insertion
por: Keil, Eberhard, et al.
Publicado: (1976) -
Run 1060, 5.10.79, both rings 26 GeV, Run 1063, 11.10.79, Ring 1 - 22 GeV/c, Ring 2 - 11 GeV, Beam-beam limit for a bunched beam colliding with a coasting beam
por: Hofmann, A, et al.
Publicado: (1979) -
Run 127 (29.11.71), 10.5 GeV/c, 4 bunches, Ring 1 and Ring 2.: Survey of Beam Behaviour at 10.5 GeV/c
por: Keil, Eberhard
Publicado: (1971) -
Run 1060, 5.10.79, both rings 26 GeV, Run 1063, 11.10.79, Ring 1 - 22 GeV, Ring 2 - 11 GeV, Beam-beam limit for a bunched beam colliding with a coasting beam
por: Hofmann, A, et al.
Publicado: (1979)