Cargando…
Run 772 - 8.11.1976, Run 776 - 19.11.1976, Run 779 - 22.11.1976, Rings 1 and 2 - 26 GeV/c, Tests of the low-B insertion in I1
Autores principales: | Brand, K, Gourber, J P, Kantardjian, G |
---|---|
Lenguaje: | eng |
Publicado: |
1977
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131187 |
Ejemplares similares
-
Run 776 - 18 November - 26 GeV/c - Rings 1 and 2, Run 791 - 13 December 1976 - 26 GeV/c - Physics set-up and run, Run 764 - 20 December 1976 - 26 GeV/c - Physics run and luminosity, First running-in tests of I1 superconducting solenoid
por: Bryant, P J, et al.
Publicado: (1977) -
Run 775 MD, 1976-11-12, Vacuum Limit in Ring 2
por: Fischer, E, et al.
Publicado: (1976) -
Run 711 - 27 April 1976, Ring 1 - 11.776 GeV/c - 8C working line, Test of COCO program
por: Autin, B
Publicado: (1976) -
Run 772 - 11 November 1976, Ring 2 - 26.588 GeV/c: COOL - A working line with $Q_{v}$ = 8.3
por: Wyss, C
Publicado: (1977) -
Physics Run Analysis No. 1 - 1976, Periods 1 and 2 (1st March to 7th April, 1976)
por: Lemeilleur, F, et al.
Publicado: (1976)