Cargando…
Run 800 - 18th January 1977 - 26 GeV/c - Rings 1 and 2, Run 810 - 3rd February 1977 - 26 GeV/c - Ring 2, Running-in Tests of the I1 S.C. Solenoid with the Low-B Sheme
Autores principales: | Bryant, P J, Guignard, G, Kantardjian, G |
---|---|
Lenguaje: | eng |
Publicado: |
1977
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131232 |
Ejemplares similares
-
Run 884 - 20 October 1977, Rings 1 and 2 - 26 GeV/c, Low-B and solenoid ON
por: Bryant, P J, et al.
Publicado: (1977) -
Run 890 - 4 November 1977, Run 898 - 25 November 1977, Ring 2- 26 GeV
por: Galbraith, P
Publicado: (1977) -
Run 776 - 18 November - 26 GeV/c - Rings 1 and 2, Run 791 - 13 December 1976 - 26 GeV/c - Physics set-up and run, Run 764 - 20 December 1976 - 26 GeV/c - Physics run and luminosity, First running-in tests of I1 superconducting solenoid
por: Bryant, P J, et al.
Publicado: (1977) -
Run 873, 7.9.1977, 26 GeV, run 904, 6.12.1977, 26 GeV, Colliding bunched beams
por: Hansen, S, et al.
Publicado: (1978) -
Run 856, 4.7.1977, Both Rings, 3.8 GeV/c, Run 868, 25.8.1977, Both Rings, 3.8 GeV/c, Injection at 3.8 GeV/c
por: Hofmann, A
Publicado: (1977)