Cargando…
Runs 800, 813, 842 and physics runs from 18.1.77 to 21.5.77, Development of a new set-up for working line measurements including a Fast Fourier Transform Spectrum Analyser and using weak beam excitiation with broad-band noise
Autor principal: | Borer, J |
---|---|
Lenguaje: | eng |
Publicado: |
1977
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131233 |
Ejemplares similares
-
Run 813, 77-2-28, high Intensity Stacking on ELVA in Ring 1 with Vacuum Observation
por: Fischer, E, et al.
Publicado: (1977) -
Vertical Overlap knockout feedback system, Run 883, 29.9.77, Run 890, 4.11.77
por: Peschardt, E
Publicado: (1977) -
Run 811, 21.2.77, Ring 1, 11 GeV, Run 813, 28.2.77, Ring 1, 26 GeV, Run 822, 9.3.77, Ring 1, 26 GeV, RF cavity no. 5 modified to work as an active Landau cavity at the 4th RF harmonic
por: Frischholz, Hans, et al.
Publicado: (1977) -
Memorandum: beam dump run-77-107
por: CERN. Geneva. SPS Experiments Committee
Publicado: (1977) -
Memorandum: beam dump run-77-120
por: CERN. Geneva. SPS Experiments Committee
Publicado: (1977)