Cargando…
Run 831, 31.03.7 7, 26 GeV/c, Ring 2, ELVA, Surpassing the 40 Amps limit in the ISR (R2)
Autores principales: | Fischer, E, Hauer, M, Hilleret, Noël, Laurent, J M, Lewis, D |
---|---|
Lenguaje: | eng |
Publicado: |
1977
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131242 |
Ejemplares similares
-
"ISR Performance Report, ""Ring 1 radial collimator 241"", Run 831, 31,3,77, 26 GeV"
por: Risselada, Thys
Publicado: (1977) -
Run 514, 75-7-3, Ring 1, ELVA, 26 GeV/c, Vacuum Limit in Ring 1
por: Calder, R, et al.
Publicado: (1975) -
First cooling in the ISR of the Cold Bore II to 4.2 K during Run 914 (6-7 March 1978)
por: Benvenuti, C, et al.
Publicado: (1978) -
Correction to the first page of ISR Performance Report, ISR-VA/NH/sm, 9.11.79
por: Hilleret, Noël
Publicado: (1979) -
Run 609, 30.5.75, Ring 2, working line ELVA, 26 GEV, Vacuum Limit in Ring 2
por: Calder, R, et al.
Publicado: (1975)