Cargando…
Run 846, 5.5.1977, Both rings, 11 GeV/c, Beam-beam limit with high-beta insertion
Autores principales: | Hübner, K, Vos, L, Zotter, B |
---|---|
Lenguaje: | eng |
Publicado: |
1977
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131251 |
Ejemplares similares
-
run 873, 6.9.1977, Both rings, 15 GeV/c, Beam-beam Q-shift with high-beta insertion
por: Hübner, K, et al.
Publicado: (1977) -
Run 901, 30.11.1977, Both rings, 15 GeV/c, Beam-beam limit with high-beta insertion
por: Hübner, K, et al.
Publicado: (1978) -
Run 1060, 5.10.1973, both rings, 26 GeV, Beam-beam effect with one beam bunched
por: Hofmann, A, et al.
Publicado: (1979) -
Run 724, 24.5.1976, Both rings, 26/11 GeV/c, Beam-beam limit with high-B insertion
por: Keil, Eberhard, et al.
Publicado: (1976) -
Run 1060, 5.10.79, both rings 26 GeV, Run 1063, 11.10.79, Ring 1 - 22 GeV, Ring 2 - 11 GeV, Beam-beam limit for a bunched beam colliding with a coasting beam
por: Hofmann, A, et al.
Publicado: (1979)