Cargando…
Runs 853 to 892 (889) from 27.6.77 to 3.11.77, Further signal and hardware investigations for the design of the new Schottky set-up
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
1977
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131261 |
_version_ | 1780915220695220224 |
---|---|
author | Borer, J |
author_facet | Borer, J |
author_sort | Borer, J |
collection | CERN |
id | cern-1131261 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 1977 |
record_format | invenio |
spelling | cern-11312612023-04-17T12:01:04Zhttp://cds.cern.ch/record/1131261engBorer, JRuns 853 to 892 (889) from 27.6.77 to 3.11.77, Further signal and hardware investigations for the design of the new Schottky set-upAccelerators and Storage Ringsoai:cds.cern.ch:11312611977-11-17 |
spellingShingle | Accelerators and Storage Rings Borer, J Runs 853 to 892 (889) from 27.6.77 to 3.11.77, Further signal and hardware investigations for the design of the new Schottky set-up |
title | Runs 853 to 892 (889) from 27.6.77 to 3.11.77, Further signal and hardware investigations for the design of the new Schottky set-up |
title_full | Runs 853 to 892 (889) from 27.6.77 to 3.11.77, Further signal and hardware investigations for the design of the new Schottky set-up |
title_fullStr | Runs 853 to 892 (889) from 27.6.77 to 3.11.77, Further signal and hardware investigations for the design of the new Schottky set-up |
title_full_unstemmed | Runs 853 to 892 (889) from 27.6.77 to 3.11.77, Further signal and hardware investigations for the design of the new Schottky set-up |
title_short | Runs 853 to 892 (889) from 27.6.77 to 3.11.77, Further signal and hardware investigations for the design of the new Schottky set-up |
title_sort | runs 853 to 892 (889) from 27.6.77 to 3.11.77, further signal and hardware investigations for the design of the new schottky set-up |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1131261 |
work_keys_str_mv | AT borerj runs853to892889from27677to31177furthersignalandhardwareinvestigationsforthedesignofthenewschottkysetup |