Cargando…
Runs 853 to 892 (889) from 27.6.77 to 3.11.77, Further signal and hardware investigations for the design of the new Schottky set-up
Autor principal: | Borer, J |
---|---|
Lenguaje: | eng |
Publicado: |
1977
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131261 |
Ejemplares similares
-
Run 853, 26 GeV, 28.6.77, Circulating beams with SFM off
por: Hoffmann, H
Publicado: (1977) -
Runs 850, 21.6.77, and 853, 28.6.77, Stochastic acceleration and vertical betatron cooling with the improved cooling pick-up (CPU)
por: Faltin, L
Publicado: (1977) -
Runs 850, 21.6.77, and 853, 28.6.77, Stochastic acceleration and vertical betatron cooling with the improved cooling pick-up (CPU)
por: Faltin, L
Publicado: (1977) -
Vertical Overlap knockout feedback system, Run 883, 29.9.77, Run 890, 4.11.77
por: Peschardt, E
Publicado: (1977) -
Memorandum: beam dump run-77-107
por: CERN. Geneva. SPS Experiments Committee
Publicado: (1977)