Cargando…
Vertical Overlap knockout feedback system, Run 883, 29.9.77, Run 890, 4.11.77
Autor principal: | Peschardt, E |
---|---|
Lenguaje: | eng |
Publicado: |
1977
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131283 |
Ejemplares similares
-
Run 883 MD, 26 GeV/c, 29.9.77, The Evolution of the Vertical Beam Size during Phase Displacement
por: Myers, S
Publicado: (1977) -
Run 941, 18.5.78, R1, 4h, Vertical overlap knockout feedback system
por: Peschardt, E
Publicado: (1978) -
An explanation of the inefficiency of the vertical overlap knockout feedback system?
por: Peschardt, E
Publicado: (1980) -
Run 811, 21.2.77, Ring 1, 11 GeV, Run 813, 28.2.77, Ring 1, 26 GeV, Run 822, 9.3.77, Ring 1, 26 GeV, RF cavity no. 5 modified to work as an active Landau cavity at the 4th RF harmonic
por: Frischholz, Hans, et al.
Publicado: (1977) -
Memorandum: beam dump run-77-107
por: CERN. Geneva. SPS Experiments Committee
Publicado: (1977)