Cargando…
Run 941, 18.5.78, R1, 4h, Vertical overlap knockout feedback system
Autor principal: | Peschardt, E |
---|---|
Lenguaje: | eng |
Publicado: |
1978
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131337 |
Ejemplares similares
-
An explanation of the inefficiency of the vertical overlap knockout feedback system?
por: Peschardt, E
Publicado: (1980) -
Vertical Overlap knockout feedback system, Run 883, 29.9.77, Run 890, 4.11.77
por: Peschardt, E
Publicado: (1977) -
Run 941 19 May 1978, Simulation of the running conditions to be expected with ps in the ISR
por: Fischer, H G, et al.
Publicado: (1978) -
Measurement of blow-up caused by the tracking Q-diagram meter, Run 969, 31.8.78, 5h
por: Peschardt, E, et al.
Publicado: (1978) -
Runs 981 and 982, 28.9.78 and 12.10.78, The use of the beam transfer function obtained from noise excitation to mesure the influence of the transverse wall impedance, active feedback and resonances
por: Borer, J, et al.
Publicado: (1978)