Cargando…
SFM Alignment Run 949
Autores principales: | Fischer, H G, Koutchouk, Jean-Pierre |
---|---|
Lenguaje: | eng |
Publicado: |
1978
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131341 |
Ejemplares similares
-
Run 656 - 10.11.75 - 26 GeV/c - no SFM, A new lok at ELSA: Telescopic ELSA
por: Koutchouk, Jean-Pierre
Publicado: (1975) -
Run 625, 21/07/75, 26 GeV/c without SFM, 6A in Ring 2, Influence of the clearing electrodes on the stack during injection
por: Koutchouk, Jean-Pierre
Publicado: (1975) -
Run 646 - 28 October 1975, Rings 1 and 2 - 11.7 GeV/c - with SFM, Creation of the ELSA working line
por: Koutchouk, Jean-Pierre, et al.
Publicado: (1975) -
Test-run on SFM 4,1 MW power supply
por: Fernqvist, G
Publicado: (1973) -
Run 344 - 9 August 1973, Rings 1 and 2 - 26 GeV/c - 20 bunches, SFM Running-In (No. 3 - 26FP with SFM at 1.0 T)
por: Billan, J, et al.
Publicado: (1973)