Cargando…
Runs 953 and 965, Rings 1 & 2, 11/26 GeV/c, 23.6.78 and 17.8.78, Dipolar and quadrupolar overlap knock-out with bunched beams
Autor principal: | Myers, S |
---|---|
Lenguaje: | eng |
Publicado: |
1978
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131346 |
Ejemplares similares
-
R1 short term vacuum limit, Run 965, 17.8.78, 26 GeV/c, ELVA working line
por: Gröbner, Oswald
Publicado: (1978) -
Run 921, 30.3.78, 26 GeV, Colliding bunched beams
por: Hansen, S, et al.
Publicado: (1978) -
Very low current detection in the ISR, Run 953, 22.6.78, 11 GeV/c
por: Borer, J, et al.
Publicado: (1978) -
Addendum to ISR Performance Report of 27.6.78 on, Very low current detection in the ISR, Run 953
por: Borer, J
Publicado: (1978) -
Runs 621 and 625, 26 GeV/c, ELSA, Overlap knock-out
por: Hereward, H G, et al.
Publicado: (1975)