Cargando…
Ring 1, Run 958, 26 GeV/c, LBAC, Control of the vertical closed orbit during acceleration
Autor principal: | Lewis, D M |
---|---|
Lenguaje: | eng |
Publicado: |
1978
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131347 |
Ejemplares similares
-
Run 958 - 4 August 1978, Ring 1 - 26 GeV - LBAC: Measurement of the coupling vector in Ring 1
por: Galbraith, P, et al.
Publicado: (1978) -
Run 958, 959, RIng 1 + 2, 26 GeV/c LBAC, Effect of the I5 Solenoid
por: Lewis, D, et al.
Publicado: (1978) -
Run 958 (MD), 4.8.78, Working line LBAC, 26 GeV, Effects of the I6 experimental magnets on closed orbit
por: Leistam, L
Publicado: (1978) -
Run 981, R1 + R2, 26 GeV, low-B on (LBAC), Report on the high luminosity Run 981
por: Koutchouk, Jean-Pierre, et al.
Publicado: (1978) -
run 286 - 19 March 1973, Ring 1 - 26 GeV/c - 4 bunches: Calibration of vertical closed orbit bumps by beam probes
por: Bryant, P J, et al.
Publicado: (1973)