Cargando…
R1 short term vacuum limit, Run 965, 17.8.78, 26 GeV/c, ELVA working line
Autor principal: | Gröbner, Oswald |
---|---|
Lenguaje: | eng |
Publicado: |
1978
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131350 |
Ejemplares similares
-
Runs 953 and 965, Rings 1 & 2, 11/26 GeV/c, 23.6.78 and 17.8.78, Dipolar and quadrupolar overlap knock-out with bunched beams
por: Myers, S
Publicado: (1978) -
Run 609, 30.5.75, Ring 2, working line ELVA, 26 GEV, Vacuum Limit in Ring 2
por: Calder, R, et al.
Publicado: (1975) -
run 656, 75-11-10, Ring 1, 26 GeV, ELVA, Pressure bumps at B-max places
por: Gröbner, Oswald, et al.
Publicado: (1975) -
Run 514, 75-7-3, Ring 1, ELVA, 26 GeV/c, Vacuum Limit in Ring 1
por: Calder, R, et al.
Publicado: (1975) -
Run 326, Ring 1, 26 GeV, 5C line and parasitic observations in run 329, 26 GeV: Vacuum observations in Sector 31
por: Gröbner, Oswald
Publicado: (1973)