Cargando…
Run 974 - 11.09.1978, Ring 1 Ring 2 26 GeV/c, PFW Currents for the SC low-B sheme in I8
Autor principal: | Verdier, A |
---|---|
Lenguaje: | eng |
Publicado: |
1978
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131358 |
Ejemplares similares
-
Run 987 - 23rd October 1978, RIng 2 - 26 GeV/c, PFW currents for the SC low-B scheme in I8 (cont'd)
por: Verdier, A
Publicado: (1978) -
Run 898 - 24 November 1977, Ring 2 - 26 GeV/c, PFW currents for the SC low-B machine
por: Verdier, A
Publicado: (1977) -
Run 1290 - Rings 1 and 2 - 26 GeV - 8 September 1982, Set-up, stacking and beam observation with the new DL sheme
por: Poole, J, et al.
Publicado: (1982) -
Run 800 - 18th January 1977 - 26 GeV/c - Rings 1 and 2, Run 810 - 3rd February 1977 - 26 GeV/c - Ring 2, Running-in Tests of the I1 S.C. Solenoid with the Low-B Sheme
por: Bryant, P J, et al.
Publicado: (1977) -
Run 958 - 4 August 1978, Ring 1 - 26 GeV - LBAC: Measurement of the coupling vector in Ring 1
por: Galbraith, P, et al.
Publicado: (1978)