Cargando…
Run 987 - 23rd October 1978, RIng 2 - 26 GeV/c, PFW currents for the SC low-B scheme in I8 (cont'd)
Autor principal: | Verdier, A |
---|---|
Lenguaje: | eng |
Publicado: |
1978
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131366 |
Ejemplares similares
-
Run 974 - 11.09.1978, Ring 1 Ring 2 26 GeV/c, PFW Currents for the SC low-B sheme in I8
por: Verdier, A
Publicado: (1978) -
Run 898 - 24 November 1977, Ring 2 - 26 GeV/c, PFW currents for the SC low-B machine
por: Verdier, A
Publicado: (1977) -
Minutes of the 5th meeting of the Advisory Committee, 6 October 1959: Description of experiments requested by visiting teams (cont'd)
por: CERN. Geneva. Advisory Committee
Publicado: (1959) -
Run 1228 - Ring 1- 26 GeV/c 16-17 October 1981, First test of a possible double low-B scheme for the ISR
por: Risselada, Thys, et al.
Publicado: (1981) -
Run 631 - 29th September 1975 - 15 GeV/c - R2, Run 641 - 13th October 1975 - 26 GeV/c - R2, Tests Performed on PFW13
por: CERN. Geneva. Intersecting Storage Ring Division
Publicado: (1975)