Cargando…
Run 1002, R1 + R2, 15 GeV, low-B, Setting up the low beta (I1) working condition and running the I1 Solenoid at 1.4 Tesla for 15 GeV/c
Autores principales: | Lewis, D, Fischer, C |
---|---|
Lenguaje: | eng |
Publicado: |
1978
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131370 |
Ejemplares similares
-
Run 974, 26 GeV, LBAC, R1 + R2, Solenoid at 1.4 Tesla: Checking the programme to switch off the I1 Solenoid and maintain circulating beams in the ISR
por: Gamble, J, et al.
Publicado: (1978) -
Run 1246, 26 GeV, R1, 1.3.82, Run 1250, 15 GeV, R1, 10.3.82, Measurement of betatron phase advance (2)
por: Borer, J, et al.
Publicado: (1982) -
Run 492, 15 GeV, FP line: Ionisation of sodium by 15 GeV/c protons
por: Gröbner, Oswald, et al.
Publicado: (1974) -
Run 694, R1, 26 GeV, 15.3.76, Run 698, R2, 26 GeV, 25.3.76: RF acceleration with variable $\Gamma$
por: Ciapala, Edmond, et al.
Publicado: (1976) -
Run 317, 15.4 GeV, 23.00 . 1.00
por: Lemeilleur, F
Publicado: (1973)