Cargando…
Run 1040, 15th June, 1979, 15.376 GeV/c, Tune Spread of the Bare Machine
Autor principal: | Dahlerup-Petersen, K |
---|---|
Lenguaje: | eng |
Publicado: |
1979
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131396 |
Ejemplares similares
-
Run 1164 - 11th December 1980, Rings 1 and 2 - 15.376 GeV/c, Operation with the Terwilliger Scheme at 15 GeV/c
por: Bryant, P J
Publicado: (1980) -
Analysis of the closed orbits measured in the bare machine, Runs 1024 and 1040, Rings 1 and 2, 11 and 15 GeV/c
por: Guignard, G
Publicado: (1979) -
Run 196 - 17 July 1972 - 11.780 GeV/c, Run 199 - 20 July 1972 - 15.376 GeV/c, Run 204 - 26 July 1972 - 22.505 GeV/c: Adjustment of the working lines FP for -40mm injection
por: Henrichsen, K N
Publicado: (1972) -
Run 694, R1, 26 GeV, 15.3.76, Run 698, R2, 26 GeV, 25.3.76: RF acceleration with variable $\Gamma$
por: Ciapala, Edmond, et al.
Publicado: (1976) -
Run 628 - 25 September 1975 - 15 GeV/c, Working lines of the bare machine
por: Guignard, G
Publicado: (1975)