Cargando…
Run 1053, 26 GeV/c, rings 1 and 2, Optimization of the OAFM dipole compensator magnets
Autores principales: | Risselada, Thys, Swoboda, Detlef |
---|---|
Lenguaje: | eng |
Publicado: |
1979
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131403 |
Ejemplares similares
-
Addendum to ISR Performance Report, Run 1053, 26 GeV/c, Rings 1 and 2, Optimization of the OAFM dipole compensator magnets
por: Swobodoa, D, et al.
Publicado: (1979) -
run 1053, 26 GeV/c, rings 1 and 2, Change of OAFM currents with beams
por: Lemeilleur, F, et al.
Publicado: (1979) -
runs 1044, 1052, 26 GeV, runs 1053, 1054, 22 GeV, Protection of the Superconducting Low-B insertion in I8 against proton losses
por: Lemeilleur, F, et al.
Publicado: (1979) -
Run 586 26.3.75 26 GeV: Ring 2 horizontal and vertical aperture
por: Risselada, Thys
Publicado: (1975) -
OAFM system rundown with beams using XINC, run 1091, 26 GeV/c, rings 1 and 2
por: Hémery, J Y, et al.
Publicado: (1980)