Cargando…
Run 1060, 5.10.79, both rings 26 GeV, Run 1063, 11.10.79, Ring 1 - 22 GeV, Ring 2 - 11 GeV, Beam-beam limit for a bunched beam colliding with a coasting beam
Autores principales: | Hofmann, A, Koutchouk, Jean-Pierre, Lemeilleur, F, Myers, S, O'Hanlon, H, Vos, L, Weiland, T, Zotter, B |
---|---|
Lenguaje: | eng |
Publicado: |
1979
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131410 |
Ejemplares similares
-
Run 1060, 5.10.79, both rings 26 GeV, Run 1063, 11.10.79, Ring 1 - 22 GeV/c, Ring 2 - 11 GeV, Beam-beam limit for a bunched beam colliding with a coasting beam
por: Hofmann, A, et al.
Publicado: (1979) -
Run 1060, 5.10.1973, both rings, 26 GeV, Beam-beam effect with one beam bunched
por: Hofmann, A, et al.
Publicado: (1979) -
Run 1080 (27/28.11.79), both rings, 22 GeV/c, Beam-beam limit for a bunched proton beam
por: Hofmann, A, et al.
Publicado: (1979) -
Run 918 - 11 GeV/c - Rings 1 and 2, Operation of the SFM at 0.38 T with beams of 11 GeV/c
por: Bryant, P J
Publicado: (1978) -
Run 361, 14.9.1973, Ring 1 (2 GeV/c) and Ring 2 (26 GeV/c), 20 bunches, 2 GeV - 26 GeV beam experiment. Lifetime of a 2 GeV beam
por: Hübner, K
Publicado: (1973)