Cargando…
ISR and P Group Performance Report, Run 1082 - 4th December 1979: Prototype test of the monitor and processing system for P beam position measurement
Autores principales: | Borer, J, Cocq, D, Kropf, H, Paillard, C |
---|---|
Lenguaje: | eng |
Publicado: |
1980
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131427 |
Ejemplares similares
-
ISR and P Group Performance Report, Run 1082 - 4th December 1979: Prototype test of the monitor and processing system for p beam position measurement
por: Borer, J, et al.
Publicado: (1980) -
Measurement of the Beam-Beam Tune Spread II, Run 1082, 3rd December 1979
por: Myers, S
Publicado: (1980) -
Running-in and operation of the new P Beam Position Monitoring System both in TT6-TT1 and Ring 2, Runs 1178 to 1184, 18.3.82 to 4.4.81
por: Borer, J, et al.
Publicado: (1981) -
Système de mesure de trajectoires en TT6-TT1 et d'orbites en R2 pour les antiprotons aux ISR: Partie 1 : description et performance du système
por: Borer, J, et al.
Publicado: (1982) -
List of ISR reports published from July 1979 to December 1979
por: CERN. Geneva. ISR Division, et al.
Publicado: (1980)