Cargando…
Verification of the computer controlled rundown of the I1 solenoid
Autor principal: | Gamble, J |
---|---|
Lenguaje: | eng |
Publicado: |
1979
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131436 |
Ejemplares similares
-
Run 974, 26 GeV, LBAC, R1 + R2, Solenoid at 1.4 Tesla: Checking the programme to switch off the I1 Solenoid and maintain circulating beams in the ISR
por: Gamble, J, et al.
Publicado: (1978) -
OAFM system rundown with beams using XINC, run 1091, 26 GeV/c, rings 1 and 2
por: Hémery, J Y, et al.
Publicado: (1980) -
Minutes of PS technical meeting n°72 held on 7th june 1995: rundown of CERNVM
por: Allardyce, B W
Publicado: (1995) -
Emittance control in rf cavities and solenoids
por: Eshraqi, Mohammad, et al.
Publicado: (2009) -
Solenoidal optics
por: Royer, Ph
Publicado: (2000)