Cargando…
Run 68 - 9 June 1971, 20 bunches - 26 GeV - Ring 1, Stacking at the bottom with intermediate scraping of the tail
Autor principal: | Resegotti, Lorenzo |
---|---|
Lenguaje: | eng |
Publicado: |
1971
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131506 |
Ejemplares similares
-
Run 54 - May 18 1971, Both rings, 4 bunches, 26 GeV/c: Stacking and lifetime experiments
por: Resegotti, Lorenzo
Publicado: (1971) -
"ISR Running-In, Run 68: 20 bunches, 26 GeV/c, Stacking at bottom in R1, at top in R2"
por: Schnell, Wolfgang
Publicado: (1971) -
Run 30, 26.2.1971, 15 GeV. Ring 1, Last 1 1/2 hours: stacking at bottom with 20 bunches
por: Schnell, Wolfgang
Publicado: (1971) -
Run 193F - 28 June 1972, Rings 1 and 2 - 26 GeV/c - 20 bunches: RF scraping of low energy tail
por: Laeger, H
Publicado: (1972) -
Run 67 - 9 June 1971 - Rings 1 + 2 - 25 GeV/c - 4 bunches, Run 68 - 9 June 1971 - Rings 1 + 2 - 25 GeV/c - 20 bunches
por: Autin, B, et al.
Publicado: (1971)