Cargando…
Run no. 79. 22 GeV. 4 bunches, Working line: FS-22, Stacking with Suppressed Buckets
Autor principal: | Hansen, S |
---|---|
Lenguaje: | eng |
Publicado: |
1971
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131544 |
Ejemplares similares
-
Run no. 85, 22 GeV, 20 bunches, Working line 22 FA, Stacking with Suppressed Buckets
por: Hansen, S
Publicado: (1971) -
Run no. 133, 15.12.1971, 22 GeV, 20 bunches, R.1: Stacking with Missing-Bunch Phase-Lock and Suppressed Buckets
por: Brown, P, et al.
Publicado: (1971) -
Run 74, 20 bunches, 22 GeV, working point FS 22. Stacking at the bottom. Studies with vertically blown-up beams and dilute stacks
por: Schnell, Wolfgang
Publicado: (1971) -
Run 151, 22 GeV/c, 20 bunches, Ring 2, Suppressed Bucket Studies
por: Hansen, S
Publicado: (1972) -
Run no. 124, 22.11.1971, 4 bunches, 22 GeV, Working line 22 FB
por: Hansen, S, et al.
Publicado: (1971)