Cargando…
Run 101, Ring 1, 15 GeV, 20 bunches, working line 15 FA (with closed orbit corrections)
Autor principal: | Zotter, B |
---|---|
Lenguaje: | eng |
Publicado: |
1971
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131611 |
Ejemplares similares
-
Run 118, 15 GeV, 15 FA, 4 bunches
por: Gröbner, Oswald
Publicado: (1971) -
Run 121. 4th November 1971, Longitudinal Instability Tests with RF-cavity in Ring I, 15 GeV, 20 bunches, working line 15 FA
por: Zotter, B, et al.
Publicado: (1971) -
Run 101, Ring 2, 15 GeV/c - 20 bunches - 150L, 15.00 - 18.00h
por: Keil, Eberhard
Publicado: (1971) -
Run 129 - 1 December 1971, Ring 1 - FATA (15 FA) - 15 GeV/c - 20 bunches: Centering of a stack
por: Henrichsen, K N
Publicado: (1971) -
Measurements with clearing electrodes at intersecting point I-6, Run 121, Ring 1 and 2, 15 GeV, 20 bunches, 15 FA in both rings
por: Gröbner, Oswald
Publicado: (1971)