Cargando…
Run 246 - 30/31 October 1972, Ring 2 - 22 GeV/c - 20 bunches, Q-shift in a shaved stack
Autores principales: | Autin, B, Thorndahl, L, Vaughan, A |
---|---|
Lenguaje: | eng |
Publicado: |
1972
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131620 |
Ejemplares similares
-
Run 254 - 16 November 1972, Ring 2 - 22 GeV/c - 20 bunches: Shifts of $Q_{H}$ and $Q_{V}$ in a shaved stack
por: Autin, B, et al.
Publicado: (1972) -
Run 246M - 31 October 1972, Ring 2 - 22 GeV/c - 20 bunches, Beam loss during acceleration when shaving
por: Laeger, H
Publicado: (1972) -
Run 254 - 16 November 1972, Ring 2 - 22 GeV/c - 20 bunches: Shifts of $Q_{H}$ and $Q_{V}$ in a shaved stack
por: Autin, B
Publicado: (1972) -
Run 222, 1.9.72, 26 GeV, 20 bunches, R1, $Q_{V}$ Measurement by RF Knock-Out
por: Autin, B, et al.
Publicado: (1972) -
Run 245, 25th October 1972, 26.5 GeV/c, Run 246, 30th October 1972, 22.5 GeV/c, Pressure Bump Situation
por: Fischer, E
Publicado: (1972)