Cargando…
Run 246 - 30 October 1972, Ring 2 - 22 GeV/c - 20 bunches - 1 in 3 mode, Comparison and calibration of vertical closed orbit bumps for the normal machine
Autor principal: | Bryant, P J |
---|---|
Lenguaje: | eng |
Publicado: |
1972
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131632 |
Ejemplares similares
-
Run 260 - 27 November 1972, Ring 1 - 26 GeV/c - 4 bunches, Heights of vertical closed orbit bumps across the aperture
por: Bryant, P J
Publicado: (1972) -
Run 259 - 22 November 1972, Ring 1 - 22 GeV/c - 20 bunches, Meaurement of vertical closed orbit bumps for the Terwilliger machine
por: Bryant, P J
Publicado: (1973) -
run 286 - 19 March 1973, Ring 1 - 26 GeV/c - 4 bunches: Calibration of vertical closed orbit bumps by beam probes
por: Bryant, P J, et al.
Publicado: (1973) -
Run 245, 25th October 1972, 26.5 GeV/c, Run 246, 30th October 1972, 22.5 GeV/c, Pressure Bump Situation
por: Fischer, E
Publicado: (1972) -
Run 276 - 1st March 1973, Ring 1 - 26 GeV/c - 20 bunches, The Correction of Vertical Closed Orbit Bumps for Shifts in $Q_{V}$
por: Bryant, P J
Publicado: (1973)