Cargando…
Run 259 - 22 November 1972, Ring 1 - 22 GeV/c - 20 bunches, Meaurement of vertical closed orbit bumps for the Terwilliger machine
Autor principal: | Bryant, P J |
---|---|
Lenguaje: | eng |
Publicado: |
1973
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131650 |
Ejemplares similares
-
Run 259 - 22 November 1972, Rings 1 and 2 - 22 GeV/c - 20 bunches
por: Bryant, P J
Publicado: (1972) -
Run 260 - 27 November 1972, Ring 1 - 26 GeV/c - 4 bunches, Heights of vertical closed orbit bumps across the aperture
por: Bryant, P J
Publicado: (1972) -
Run 246 - 30 October 1972, Ring 2 - 22 GeV/c - 20 bunches - 1 in 3 mode, Comparison and calibration of vertical closed orbit bumps for the normal machine
por: Bryant, P J
Publicado: (1972) -
Run 156 - 17th April 1972, Ring 1 - 22 GeV/c - 4 bunches: Terwilliger Scheme
por: Bryant, P J
Publicado: (1972) -
Run 239 - 18 October 1972, Rings 1 and 2 - 22 GeV/c - 20 bunches: High intensity with the Terwilliger scheme
por: Bryant, P J
Publicado: (1972)