Cargando…
Run no. 60, 27.11.72, 26 GeV, 4b, RF synchronisation of both rings
Autor principal: | Hansen, S |
---|---|
Lenguaje: | eng |
Publicado: |
1972
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131652 |
Ejemplares similares
-
Run no. 260, 27.11.72, 26 GeV, 4b, Closed loop matching, R2
por: Hansen, S
Publicado: (1972) -
Run 260, 28.22.72. 26 GeV, Ring 1, 26 FP, Run 264, 01.12.72. 26 GeV, Ring 1, 26 FP, Desorption coefficients for hot and cold vacuum chambers
por: Calder, R, et al.
Publicado: (1972) -
Run 264, 26 GeV, 1.12.72, Ring 2, Spill-out as function of RF voltage for shaved and unshaved beam
por: De Jonge, M J
Publicado: (1972) -
Run 195, 26 GeV, 20 bunches, 30.6.72. Ring 1, 26 FP: Beam Pumping
por: Calder, R, et al.
Publicado: (1973) -
Run 535, 27.9.74 - 26 GeV, Ring 2: Decelerated Clusters
por: Hoffmann, H
Publicado: (1974)