Cargando…
Run 262F, 26 GeV/c, 29.11.72, Spill-out as function of RF voltage for shaved and unshaved beam
Autores principales: | Hübner, K, De Jonge, M |
---|---|
Lenguaje: | eng |
Publicado: |
1972
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131657 |
Ejemplares similares
-
Run 264, 26 GeV, 1.12.72, Ring 2, Spill-out as function of RF voltage for shaved and unshaved beam
por: De Jonge, M J
Publicado: (1972) -
Run 254, 22 GeV/c, 2C working line, Spill-out as function of RF voltage for shaved and un-shaved beam
por: Hübner, K, et al.
Publicado: (1972) -
Stability of shaved beam, Run 239 - 18.10.72, Ring 1 - 22 GeV/c - 22 FP
por: Hübner, K
Publicado: (1972) -
Stability of shaved beam, Run 239 - 18.10.72, Ring 1 - 22 GeV/c - 22 FP
por: Hübner, K
Publicado: (1972) -
Run 232, 25.09.72, 18-22h. Ring 2, 4 bunches, 26 GeV/c: Test of computerised RF system
por: De Jonge, M J, et al.
Publicado: (1972)