Cargando…
Run 264, 26 GeV, 1.12.72, Ring 2, Spill-out as function of RF voltage for shaved and unshaved beam
Autor principal: | De Jonge, M J |
---|---|
Lenguaje: | eng |
Publicado: |
1972
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131658 |
Ejemplares similares
-
Run 262F, 26 GeV/c, 29.11.72, Spill-out as function of RF voltage for shaved and unshaved beam
por: Hübner, K, et al.
Publicado: (1972) -
Run 254, 22 GeV/c, 2C working line, Spill-out as function of RF voltage for shaved and un-shaved beam
por: Hübner, K, et al.
Publicado: (1972) -
Run 264 - 26 GeV/c - Ring 1, 2C26 Working Line - 60% Shaving
por: Lemeilleur, F
Publicado: (1972) -
Run 260, 28.22.72. 26 GeV, Ring 1, 26 FP, Run 264, 01.12.72. 26 GeV, Ring 1, 26 FP, Desorption coefficients for hot and cold vacuum chambers
por: Calder, R, et al.
Publicado: (1972) -
Run no. 60, 27.11.72, 26 GeV, 4b, RF synchronisation of both rings
por: Hansen, S
Publicado: (1972)