Cargando…
"ISR Performance Report, Beam Observation, Test of BPMS in ""single turn"" mode, Run 265, 11.12.72, 22 GeV/c, 20 bunches, 1 pulse out of 3"
Autor principal: | Borer, J |
---|---|
Lenguaje: | eng |
Publicado: |
1972
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131667 |
Ejemplares similares
-
Run 376, 29.10.73, 26 GeV, 20 bunches: Running-in of the BPMS in the single turn mode (first turn)
por: Borer, J, et al.
Publicado: (1973) -
"ISR Performance Report, Run 251, R1/R2, 11 GeV/c, Running-in of the B.P.M.S. in the ""single turn"" mode"
por: Borer, J
Publicado: (1972) -
Beam Position Observation, Scaling factor of BPMS, Run 65, 8.6.1971, 22 GeV, 4 bunches
por: Borer, J
Publicado: (1971) -
Run 265 - 22 GeV/c - 4 bunches - WL 2C22 - R1
por: Vos, L
Publicado: (1972) -
"ISR Performance Report, Runs 133, 22 GeV: 20 bunches
por: Jones, E, et al.
Publicado: (1972)