Cargando…
Working lines with injection at -40mm as they exist at the end of 1972
Autor principal: | Laeger, H |
---|---|
Lenguaje: | eng |
Publicado: |
1973
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131680 |
Ejemplares similares
-
Run 260, 27.11.1972, 20 bunches, 26 GeV/c, Stacking with the 3 cm working line
por: Hübner, K, et al.
Publicado: (1972) -
run 177 - 29 May 1972, Ring 1 - 26.624 GeV/c - 4 bunches: Working line for physics 26 FP
por: Laeger, H
Publicado: (1972) -
Run 250M - 3rd November 1972, 26 GeV/c - Rings 1 and 2, Working line 3C26
por: Laeger, H
Publicado: (1972) -
Run 196 - 17 July 1972 - 11.780 GeV/c, Run 199 - 20 July 1972 - 15.376 GeV/c, Run 204 - 26 July 1972 - 22.505 GeV/c: Adjustment of the working lines FP for -40mm injection
por: Henrichsen, K N
Publicado: (1972) -
Run 191 - 26 June 1972, Ring 1 - 26 GeV/c - 4 bunches: Working lines 26FP and 2C26 for Ring 1
por: Laeger, H
Publicado: (1972)