Cargando…
Running-in and operation of the new P Beam Position Monitoring System both in TT6-TT1 and Ring 2, Runs 1178 to 1184, 18.3.82 to 4.4.81
Autores principales: | Borer, J, Cocq, D, Kropf, H, Paillard, C, Tranchant, P, Hémery, J Y, Kemp, D, Keyser, R |
---|---|
Lenguaje: | eng |
Publicado: |
1981
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131695 |
Ejemplares similares
-
Injection and Stacking of Antiprotons, Run 1184 F, 2-4.4.81
por: Ciapala, Edmond
Publicado: (1981) -
Système de mesure de trajectoires en TT6-TT1 et d'orbites en R2 pour les antiprotons aux ISR: Partie 1 : description et performance du système
por: Borer, J, et al.
Publicado: (1982) -
ISR and P Group Performance Report, Run 1082 - 4th December 1979: Prototype test of the monitor and processing system for p beam position measurement
por: Borer, J, et al.
Publicado: (1980) -
ISR and P Group Performance Report, Run 1082 - 4th December 1979: Prototype test of the monitor and processing system for P beam position measurement
por: Borer, J, et al.
Publicado: (1980) -
VeloTT tracking for LHCb Run II
por: Bowen, Espen Eie, et al.
Publicado: (2016)