Cargando…
Runs 1193 and 1194 - 8th May 1981, Rings 1 and 2 - 11 GeV/c, FP and TW Working Lines at 11 GeV/c
Autores principales: | Bryant, P J, Olsen, Ø |
---|---|
Lenguaje: | eng |
Publicado: |
1981
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131705 |
Ejemplares similares
-
run 1193 - p = 11.788 GeV/c - 8.5.1981, Verification and adjustment of the compensation for EM608/1 at p = 11.788 GeV/c
por: Swoboda, Detlef
Publicado: (1981) -
Run 1193 - 8 May 1981, 11 GeV/c - Both rings, Closed orbits and working lines in the bare machine
por: Guignard, G
Publicado: (1981) -
Run 1180 - Ring 1 - 27th March 1981, Run 1193 - Ring 1 - 7th May 1981, Run 1196 - Ring 2 - 14/15th May 1981, Acceleration from 26 to 31 GeV/c on FP
por: Bryant, P J, et al.
Publicado: (1981) -
Calibration of Luminosity Bumps in Intersection 2, 26 GeV/c FP and TW
por: Potter, K
Publicado: (1981) -
Correction of the FP Line and Creation of New TW Line at 22 GeV/c, Run 1304, 25.10.82
por: Olsen, R
Publicado: (1982)