Cargando…
run 1193 - p = 11.788 GeV/c - 8.5.1981, Verification and adjustment of the compensation for EM608/1 at p = 11.788 GeV/c
Autor principal: | Swoboda, Detlef |
---|---|
Lenguaje: | eng |
Publicado: |
1981
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131708 |
Ejemplares similares
-
Runs 1193 and 1194 - 8th May 1981, Rings 1 and 2 - 11 GeV/c, FP and TW Working Lines at 11 GeV/c
por: Bryant, P J, et al.
Publicado: (1981) -
Run 1193 - 8 May 1981, 11 GeV/c - Both rings, Closed orbits and working lines in the bare machine
por: Guignard, G
Publicado: (1981) -
Tests on helicity conservation in interactions $\pi^{+}$ p at 11.7 GeV/c and $\pi^{-}$ p at 11.2 GeV/c
por: Evans, D, et al.
Publicado: (1973) -
Posters P788 - P999
Publicado: (2005) -
Run 1202 - 11, 12, 13 June 1981 - 31 GeV/c, Twelfth SL test, check of centring and acceleration
por: Guignard, G, et al.
Publicado: (1981)