Cargando…
Run 1222 - Rings 1 and 2 - 2nd October 1981, Check of the 5-magnet, Slim-Dipole Bumps for I1 at 26 GeV/c
Autor principal: | Bryant, P J |
---|---|
Lenguaje: | eng |
Publicado: |
1981
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131723 |
Ejemplares similares
-
Run 370 - 9 October 1973, Rings 1 and 2 - 26 GeV/c, Slope Bumps
por: Bryant, P J
Publicado: (1974) -
Replacement of ISR Performance Report, Run 1208 - Ring 1 - 26 GeV/c - 11th August 1981, The Effects of Correction Windings and the Horizontal Closed Orbit on Luminosity Bumps
por: Bryant, P J, et al.
Publicado: (1982) -
Run 1284 - 15th July 1982, 26 GeV/c - Ring 1, Radial Bumps in I2 Intersection
por: Bryant, P J
Publicado: (1982) -
Run 1221, 26 GeV/c, Ring 1 only, 1st October 1981, Beam Stability during Stacking
por: Dahlerup-Petersen, K
Publicado: (1981) -
Calibration of Luminosity Bumps in Intersection 2, 26 GeV/c FP and TW
por: Potter, K
Publicado: (1981)