Cargando…
Run 1260 - 26th April 1982, Rings 1 and 2 - 26-31 GeV/c, Horizontal Orbit Distortion due to the Fringe Field on the DL machine
Autor principal: | Bryant, P J |
---|---|
Lenguaje: | eng |
Publicado: |
1982
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1131744 |
Ejemplares similares
-
Run 1290 - 9th September 1982, Rings 1 and 2 - 26 - 31 GeV/c, Compensation of Fringe Field Using Correction Windings on the New DL Machine
por: Bryant, P J
Publicado: (1982) -
Run 1260 and 1264 - Rings 1 & 2 - 26 GeV, Stacking in both rings and physics test for the DL machine
por: Risselada, Thys, et al.
Publicado: (1982) -
Losses in I6, Part 2, Run 1260, 15 June 1982, 26 GeV/c Ring 2
por: Smith, A
Publicado: (1982) -
Run 1290 - 9th September 1982, Ring 1 - 26.558 GeV/c, Closed Orbits in Ring 1
por: Bryant, P J
Publicado: (1982) -
Run 1290 - Rings 1 and 2 - 26 GeV - 8 September 1982, Set-up, stacking and beam observation with the new DL sheme
por: Poole, J, et al.
Publicado: (1982)